Workmen Productivity Improvement

Have you deployed workmen scientifically?

If no, then you might have deployed 10 – 15% excess workmen on the shop floor losing financially month over month in terms of higher wages and salaries. The workmen's productivity improvement project can help you save this cost.

How Do We Do?

  • We measure the work content of every workman by Maynard Operation Sequence Technique (MOST), time and motion study, and cycle time study.
  • balance the work content in a way that every individual has adequate work content
  • The study has usually resulted in a 10 – 15% reduction in workmen on the shop-floor

Implemented At:

  • Sheela Foam – Talvada (Gujrat), Jalpaiguri (West Bengal), Rajpura (Punjab)
  • Ananda Dairy, Pilkhua
  • Allana Indagro Food Pvt Ltd. , Unnao

Duration 2 – 3 months
The project has less than 3 months of ROI